Here are photos of the foundation. To the right wing side, the contractor ran out of concrete mix, so they finished that part of the foundation the next day. The flagstone patio was built by the first contractor (when they messed up the first attempt at the oven). The second contractor had to dig out to pour the foundation a little further back (front to back) and they poured it higher to match up with the patio level.

The completed foundation with the oven dome on top to help check dimensions. The dome will actually be further forward when it's actually installed on top of the hearth.